By adopting jet grouting, ground water was controlled effectively, and thus further excavation and implementation of the scheme of grouted rubble revetment were ensured. 采用高压旋喷注装进行止水防渗处理后,地下水得到了有效的控制,保证了基坑进一步开挖和装砌块石护坡方案的顺利施工。
The remains of a great circle of standing stones surround the mound. 环绕在土石堆周围的是一大圈残缺不全的立石。
Rescuers are continuing to search the rubble for possible survivors. 救护人员正不停地在石堆中寻找可能生还的人。